How We Build a Milton Garage or Shop Floor
An attached garage on a newer Milton build is straightforward work: a sound, level slab that needs grinding and nothing more. Outbuilding slabs are their own problem. They were often placed by a different crew in a different year to the house, finished with a broom rather than a power trowel, and left bare ever since. That surface has to be ground flat and open before anything is poured over it, and on a rough agricultural pour that is a longer job than it is on a garage floor. We would rather tell you that at the estimate than discover it on the day.
The system on top is chosen for the traffic. A garage or workshop floor takes the standard pigmented epoxy body coat and a polyaspartic top. A building that sees a tractor, a skid steer, or a loaded trailer gets more thickness and a harder wearing topcoat, because steel wheels and turning tires ask far more of a floor than a car ever will. Wash areas get extra grit worked into the final coat as a matter of course.


.avif)
.avif)




